EA-GAS

Feasibility Study

PROJECT LOCATION

PROJECT TYPE

ESTIMATED VOLUMES PER YEAR

East Africa

Small Scale Bulk

4 Mill MMBTU

The Gas supply is in support of a 50MW power project in East Africa. The Electricity Project will require 3.5Mill MMBTU of natural gas in year one with a growth rate as follows as power consumption for the area increases at a minimum growth rate of 5.6% per year:

The project feasibility confirms that Volco Power is able to source and provide the necessary Natural Gas for the delivery to the power plant, in the form of LNG for the life of the project of +/- 30 years.

LNG will be delivered via bulk vessels (+18,000m3 LNG capacity) with a shallow enough draft adequate to birth in the harbour.

LNG will then be directly transferred to on-land storage capable of storing over 27 days’ supply of Natural Gas to the Power Plant.

Facebook Twitter Google+ Pinterest

Contact us



Johannesburg Branch

Email: info@volcopower.com
Phone: +27 11 678 0945
Address:62 7th Avenue, Parktown North, 2193, Johannesburg

Cape Town Branch

Dale Visser - Lead Project Manager
Email: info@volcopower.com
Phone: +27 83 261 3242